Rajesh Verekar, along with local workers, met the Executive Engineer, who assured that the issue would be resolved within eight days
Nagamasjid-Kurti Area Faces Power Cuts During Night Prayers
Rajesh Verekar, along with local workers, met the Executive Engineer, who assured that the issue would be resolved within eight days
Please save +91 86055 95801
in order to get daily updates over
WhatsApp
